America needs a better way to meet the energy demands of the future.

Scheid Power Generation can help.

 

Megawatt System Available
0
Starting in 2026, Scheid Power Generation will begin delivering a 740 Megawatts On-Site Power System.
1560mw system available in 2027.
2140 system available in 2028.
texas grid
 
Data Centers and AI server farms have negatively impacted the US energy grid by reducing the energy supply and raising the cost for all consumers.
How can Scheid Power Generation help?
With our system the energy is produced On-Site, with no strain on the energy grid. By taking Data Centers off the grid, energy prices for all consumers will come down.

 

How the SPG On-Site Power System Works

 The SPG On-Site power generation system is powered by a custom engineered driver that has the highest efficiency.
The system powers multiple generators that produce clean, redundant on-site power.
Having ambient temperature exhaust eliminates the need for water for cooling.
Requires an adequate supply of natural gas.
Contact us to get more information!
No H2O
The SPG power generation system requires
NO ADDITIONAL WATER SUPPLY!
Traditional data center power systems require large amounts of water.